• Home
  • Browse
    • Current Issue
    • By Issue
    • By Author
    • By Subject
    • Author Index
    • Keyword Index
  • Journal Info
    • About Journal
    • Aims and Scope
    • Editorial Board
    • Publication Ethics
    • Indexing and Abstracting
    • Related Links
    • FAQ
    • Peer Review Process
    • News
  • Guide for Authors
  • Submit Manuscript
  • Reviewers
  • Contact Us
  • List of Reviewer,s publons
  • Login
  • Register
Author = Nabipour Afrazi, Elham
Number of Articles: 1
Robust Optimization of Resource-constrained Multi-Project Scheduling Problem with Uncertain Activities Duration

Volume 52, Issue 2, July 2018, Pages 291-307

10.22059/jieng.2018.237585.1402

Elham Nabipour Afrazi; Abdollah Aghaei

  • View Article
  • PDF 1.09 M

Advances in Industrial Engineering
  • Articles in Press
  • Current Issue

Journal Archive

Volume 59 (2025)
Volume 58 (2024)
Volume 57 (2023)
Volume 56 (2022)
Volume 55 (2021)
Volume 54 (2020)
Volume 53 (2019)
Volume 52 (2018)
Volume 51 (2017)
Volume 50 (2016)
Volume 49 (2015)
Volume 48 (2014)
Volume 47 (2013)
Volume 46 (2012)
Volume 45 (2011)
Volume 44 (2010)
Volume 43 (2009)

Explore Journal

  • Home
  • About Journal
  • Editorial Board
  • Submit Manuscript
  • Contact Us
  • Sitemap

Latest News

  • AIE Evaluation 2021 by Ministry of Science, Research, and Technology 2022-08-21
  • Collaboration with Iranian Institute of Industrial Engineering 2021-12-21

Newsletter Subscription

Subscribe to the journal newsletter and receive the latest news and updates

  • © Journal Management System. Powered by Sinaweb