• Home
  • Browse
    • Current Issue
    • By Issue
    • By Author
    • By Subject
    • Author Index
    • Keyword Index
  • Journal Info
    • About Journal
    • Aims and Scope
    • Editorial Board
    • Publication Ethics
    • Indexing and Abstracting
    • Related Links
    • FAQ
    • Peer Review Process
    • News
  • Guide for Authors
  • Submit Manuscript
  • Reviewers
  • Contact Us
  • List of Reviewer,s publons
  • Login
  • Register

Developing an Intelligent Model to Optimize Linear- Repetitive Projects Scheduling

Document Type : Research Paper

Authors

  • H. Rezaei
  • P. Ghobadi
  • A. Nazari
  • M. T. Isaai
10.22059/jieng.2013.36173

Advances in Industrial Engineering
Volume 47, Issue 2 - Serial Number 2
October 2013
Pages 169-182

Files

  • XML
  • PDF 1.14 M

Share

How to cite

  • RIS
  • EndNote
  • Mendeley
  • BibTeX
  • APA
  • MLA
  • HARVARD
  • CHICAGO
  • VANCOUVER

Statistics

  • Article View: 2,826
  • PDF Download: 3,288

APA

Rezaei, H. , Ghobadi, P. , Nazari, A. and Isaai, M. T. (2013). Developing an Intelligent Model to Optimize Linear- Repetitive Projects Scheduling. Advances in Industrial Engineering, 47(2), 169-182. doi: 10.22059/jieng.2013.36173

MLA

Rezaei, H. , , Ghobadi, P. , , Nazari, A. , and Isaai, M. T. . "Developing an Intelligent Model to Optimize Linear- Repetitive Projects Scheduling", Advances in Industrial Engineering, 47, 2, 2013, 169-182. doi: 10.22059/jieng.2013.36173

HARVARD

Rezaei, H., Ghobadi, P., Nazari, A., Isaai, M. T. (2013). 'Developing an Intelligent Model to Optimize Linear- Repetitive Projects Scheduling', Advances in Industrial Engineering, 47(2), pp. 169-182. doi: 10.22059/jieng.2013.36173

CHICAGO

H. Rezaei , P. Ghobadi , A. Nazari and M. T. Isaai, "Developing an Intelligent Model to Optimize Linear- Repetitive Projects Scheduling," Advances in Industrial Engineering, 47 2 (2013): 169-182, doi: 10.22059/jieng.2013.36173

VANCOUVER

Rezaei, H., Ghobadi, P., Nazari, A., Isaai, M. T. Developing an Intelligent Model to Optimize Linear- Repetitive Projects Scheduling. Advances in Industrial Engineering, 2013; 47(2): 169-182. doi: 10.22059/jieng.2013.36173

Explore Journal

  • Home
  • About Journal
  • Editorial Board
  • Submit Manuscript
  • Contact Us
  • Sitemap

Latest News

  • AIE Evaluation 2021 by Ministry of Science, Research, and Technology 2022-08-21
  • Collaboration with Iranian Institute of Industrial Engineering 2021-12-21

Newsletter Subscription

Subscribe to the journal newsletter and receive the latest news and updates

  • © Journal Management System. Powered by Sinaweb