Rezaei, H. , Ghobadi, P. , Nazari, A. and Isaai, M. T. (2013). Developing an Intelligent Model to Optimize Linear- Repetitive Projects Scheduling. Advances in Industrial Engineering, 47(2), 169-182. doi: 10.22059/jieng.2013.36173
MLA
Rezaei, H. , , Ghobadi, P. , , Nazari, A. , and Isaai, M. T. . "Developing an Intelligent Model to Optimize Linear- Repetitive Projects Scheduling", Advances in Industrial Engineering, 47, 2, 2013, 169-182. doi: 10.22059/jieng.2013.36173
HARVARD
Rezaei, H., Ghobadi, P., Nazari, A., Isaai, M. T. (2013). 'Developing an Intelligent Model to Optimize Linear- Repetitive Projects Scheduling', Advances in Industrial Engineering, 47(2), pp. 169-182. doi: 10.22059/jieng.2013.36173
CHICAGO
H. Rezaei , P. Ghobadi , A. Nazari and M. T. Isaai, "Developing an Intelligent Model to Optimize Linear- Repetitive Projects Scheduling," Advances in Industrial Engineering, 47 2 (2013): 169-182, doi: 10.22059/jieng.2013.36173
VANCOUVER
Rezaei, H., Ghobadi, P., Nazari, A., Isaai, M. T. Developing an Intelligent Model to Optimize Linear- Repetitive Projects Scheduling. Advances in Industrial Engineering, 2013; 47(2): 169-182. doi: 10.22059/jieng.2013.36173