Document Type : Research Paper
10. Sayed, M., Afia, N., and Kharbotly, A. (2010). “A stochastic model for forward–reverse logistics network design under risk.” Computers & Industrial Engineering, Vol. 58, No. 3, 423-431.
11. Tarokh, M. J. and Naseri, A. (2012). “Genetic Algorithm and Hybrid Method to Minimize Total Distribution Cost in Multi-level Supply Chain.” Journal of Industrial Engineering, Vol. 46, No. 1, 15-26.
12. Aghaei, A. and Zandi, F. (2012). “Analyzing and Optimization a Two Echelon Supply Chain with Uncertainly Returned Product.” Journal of Industrial Engineering, Vol. 46, No. 2, 119-132.
13. Pourrousta, A., Tavakkoli Moghaddam, R., and Ebrahimnejad, S. (2012). “A Multi-product and Multi-period Model for a Procurement-production-distribution in Supply Chain with Fuzzy Parameters” Journal of Industrial Engineering, Vol. 46, No. 2, 147-156.
14. Tarokh, M. J., EsmaeiliGookeh, M., and Torabi, Sh. (2012). “A Model to Optimize the Design of a Reverse Logistic Network under Uncertainty” Journal of Industrial Engineering, Vol. 46, No. 2, 159-173.
15. Pishvaee, M. S. and Razmi, J. (2012). “Environmental supply chain network design using multi-objective fuzzy mathematical programming.” Applied Mathematical Modelling, Vol. 36, No. 8, 3433-3446.
16. Pishvaee, M. S., Razmi, J., and Torabi, S. A., (2012). “Robust possibilistic programming for socially responsible supply chain network design: A new approach.” Fuzzy Sets and Systems, Vol. 206, 1-20.
17. Pishvaee, M. S., Torabi, S. A., and Razmi, J. (2012). “Credibility-based fuzzy mathematical programming model for green logistics design under uncertainty.” Computers & Industrial Engineering, Vol. 62, No. 2, 624-632.
18. Wang, R. -C. and Liang, T. -F. (2005). “Applying possibilistic linear programming to aggregate production planning.” International Journal of Production ECOnomics, Vol.98, No. 3, 328-341.
19. Arenas Parra, M, Bilbao Terol, A., Pérez Gladish, B., and Rodrı́guez Urı́a, M. V. (2005). “Solving a multiobjective possibilistic problem through Compromise programming.” European Journal of Operational Research, Vol. 164, No. 3, 748-759.
20. Yager, R. R., (1981). “A procedure for ordering fuzzy subsets of the unit interval.” Information Sciences, Vol. 24, No. 2, 143-161.
21. Torabi, S. A. and Hassini, E. (2008). “An interactive possibilistic programming approach for multiple objective supply chain master planning.” Fuzzy Sets and Systems, Vol. 159, No. 2, 193-214.
22. Jiménez, M., Arenas, M., Bilbao, A., and Rodriguez, M. V. (2007). “Linear programming with fuzzy parameters, An interactive method resolution” European Journal of Operational Research, Vol. 177 , 1599–1609.
23. Pishvaee, M. S. and Torabi, S. A. (2010). “A possibilistic programming approach for closed-loop supply chain network design under uncertainty.” Fuzzy Sets and Systems, Vol. 161, No. 20, 2668-2683.