1- Harris, F. (1915). “Operations and cost (factory management series)”, Chicago: A. W. Show Co.
2- Hadley, G. and Whiten, T. M. (1963). “Analysis of inventory systems”, Clifs, NJ: Prentice- Hall.
3- Darwish, M. A. (2008). “EPQ models with varying setup cost.” International Journal of Production Economics, Vol. 113, No. 1, PP. 297–306.
4- Porteus, E.L. (1986). “Optimal lot sizing, process quality improvement and setup cost reduction.” Operations Research, Vol. 34, No. 5, PP. 137–44.
5- Grubbstrom, R.W. and Wang, Z. (2003). “A stochastic model of multi-level/multi-stage capacity constrained production–inventory systems.” International Journal of Production Economics, Vol.81, No. 1, PP. 483–494.
6- Rosenblatt, M.J. and Lee, H.L. (1986). “Economic production cycles with imperfect production processes.” IIE Transactions, Vol. 18, No, 1, PP. 48–55.
7- Taleizadeh, A.A., Najafi, A.A. and Niaki, S.T.A. (2010a). “Economic production quantity model with scraped items and limited production capacity.” Scientia Iranica, Vol. 17, No. 1, PP. 58–69.
8- Chan, W.M., Ibrahim, R.N. and Lochert, P.B. (2003). “A new EPQ model: Integrating lower pricing, rework and reject situation.s” Production Planning and Control, Vol. 14, No. 7, PP. 588–595.
9- Salameh, M.K. and Jaber M.Y. (2000). “Economic order quantity model for items with imperfect quality.” International Journal of Production Economics, Vol. No. 1-3, PP. 59–64.
10- Taleizadeh, A.A., Cárdenas-Barrón, L.E. and Mohammadi, B., (2014). “A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process.” International Journal of Production Economics. Vol. 3, No. 2, PP. 9–27.
11- Sarkar, B., Cárdenas-Barrón., L.E, Sarkar., M. and Singgih., M.L. (2014). An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. Journal of Manufacturing Systems, Vol. 33, No. 3, PP. 423-435.
12- Haley C.W. and Higgins, R.C. (1973). “Inventory policy and trade credit financing.” Management Science, Vol. 20, No. 4, PP. 464–471.
13- Chapman, C.B., Ward, S.C., Cooper, D.F., and Page, M. J. (1984). “Credit policy and inventory control.” Journal of the Operational Research Society, Vol. 35, No. 12, PP. 1055–1065.
14- Abada, P.L. and Jaggi, C.K. (2003). “A joint approach for setting unit price and the length of the credit period for a seller when end demand is price sensitive.” International Journal of Production Economics, Vol. 83, No. 2, PP. 115–122.
15- Chung K. and Huang, Y. (2003). “The optimal cycle time for EPQ inventory model under permissible delay in payments.” International Journal of Production Economics, Vol. 84, No. 3, PP. 307–318.
16- Chung K. and Huang, Y. (2006). “Retailer's optimal cycle times in the EOQ model with imperfect quality and a permissible credit period.” Quality and Quantity, Vol. 40, No. 1, PP. 59–77.
17- Khouja, M. and Mehrez, A. (1996). “Optimal inventory policy under different supplier credit policies.” Journal of Manufacturing Systems, Vol. 15, No. 5, PP. 334-339.