A Two-objective Robust Optimization Model for Project Risks Response Selection and Explanation Solution Method

Document Type : Research Paper

Authors

Sadjad University of Technology, Mashhad, Iran

Abstract

Risk management is one of the most important aspects of project management that identifies, assesses and responds to project risks. Although many papers have been published in project risk response, presented tools and methods are poor. Hence, in this paper, we present an optimization model to respond project risk that seeks to optimize two key criteria of project: cost and time. The proposed model has two objectives that one of them is minimization of the total cost that include abatement action cost and the cost of risk loss on project, and the other one is minimization of the time loss of risk (i.e., maximization robust measure) according to a free float activity’s measure. The model tries to choose abatement actions of risk that loss of them on time activity is greater than free float activity. Subsequently, three solution methods (i.e., exact, heuristic and meta-heuristic) are proposed. Then we create ten sample projects in three categories (i.e., small, medium and large scale) and solve the problems with the proposed methods and compare the results.

Keywords

Main Subjects


  1. Arish, A. Akbarpour, M. And Seyedesfahani, M, M. (2010). “Model-based decision support in planning risk responses”, International Journal of Industrial Engineering and Production Management, Vol. 20, No.3
  2. PMI. (2013). Project Management Body of Knowledge (PMBOK). 5thEd. Project Management Institute (PMI) Pub., USA.
  3. Chapman, Chris, & Ward, Stephen. (2011). How to manage project opportunity and risk: Why uncertainty management can be a much better approach than risk management: John Wiley & Sons.
  4. Hillson, David. (1999). Developing effective risk responses. Paper presented at the Proceedings of the 30th Annual Project Management Institute Seminars & Symposium.
  5. Ben-David, I, & Raz, T. (2001). “An integrated approach for risk response development in project planning”. Journal of the Operational Research Society 52, 14–25
  6. Seyedhoseini, Seyed Mohammad, Noori, Siamak, & Hatefi, Mohammad Ali. (2009). “An Integrated Methodology for Assessment and Selection of the Project Risk Response Actions”. Risk Analysis, 29(5), 752-763. doi: 10.1111/j.1539-6924.2008.01187.x
  7. Purnus, Augustin, & Bodea, Constanta-Nicoleta. (2013). “Considerations on Project Quantitative Risk Analysis”. Procedia-Social and Behavioral Sciences, 74, 144-153.
  8. Nieto-Morote, Ana, & Ruz-Vila, F. (2011). “A fuzzy approach to construction project risk assessment”. International Journal of Project Management, 29(2), 220-231.
  9. Taroun, Abdulmaten. (2014). Towards a better modelling and assessment of construction risk: Insights from a literature review. International Journal of Project Management, 32(1), 101-115.
  10. Mojtahedi, S Mohammad H, Mousavi, S Meysam, & Makui, Ahmad. (2010). “Project risk identification and assessment simultaneously using multi-attribute group decision making technique”. Safety science, 48(4), 499-507.
  11. Hillson, David. (2002). “Extending the risk process to manage opportunities”. International Journal of project management, 20(3), 235-240.
  12. Lee, Eunchang, Park, Yongtae, & Shin, Jong Gye. (2009). “Large engineering project risk management using a Bayesian belief network”. Expert Systems with Applications, 36(3), 5880-5887.
  13. Zhang, Yao, & Fan, Zhi-Ping. (2014). “An optimization method for selecting project risk response strategies”. International Journal of Project Management, 32(3), 412-422.
  14. S,H, Zegordi. E, Rezaeenik. A, Nazari. F, Honari Ch. (2011). “A multi-objective optimization and fuzzy prioritization approach for project risk responses selection”. Quarterly Energy Economics Review 8(1). 161-196 (In Persian)
  15. Datta, Sumit, & Mukherjee, SK. (2001). “Developing a risk management matrix for effective project planning-an empirical study”. Project Management Journal, 32(2), 45-57.
  16. Miller, Roger, & Lessard, Donald. (2001). “Understanding and managing risks in large engineering projects”. International Journal of Project Management, 19(8), 437-443.
  17. López, Cristina, & Salmeron, Jose L. (2012). “Risks Response Strategies for Supporting Practitioners Decision-Making in Software Projects”. Procedia Technology, 5(0), 437-444.
  18. Kujawski, Edouard. (2002). “Selection of technical risk responses for efficient contingencies”. Systems Engineering, 5(3), 194-212. doi: 10.1002/sys.10025
  19. Pipattanapiwong, Jirapong, & Watanabe, Tsunemi. (2000). “Multi-party Risk Management Process (MRMP) for a Construction Project Financed by an International Lender”. Paper presented at the Proceedings of the 16th ARCOM Conference.
  20. Haimes, Yacov Y. (2005). Risk modeling, assessment, and management (Vol. 40): John Wiley & Sons.
  21. Chapman, C.B. (1979). “Large engineering project risk analysis”. IEEE Transactions on Engineering Management, 26, 78–86.
  22. Klein, Jonathan H, Powell, Philip L, & Chapman, Chris B. (1994). “Project risk analysis based on prototype activities”. Journal of the Operational Research society, 749-757.
  23. Ben-David, I, Rabinowitz, G, & Raz, T. (2002). “Economic Optimization of Project Risk Management Efforts”. The Israel Institute of Business Research.
  24. Fan, Miao, Lin, Neng-Pai, & Sheu, Chwen. (2008). “Choosing a project risk-handling strategy: An analytical model”. International Journal of Production Economics, 112(2), 700-713.
  25. Gonen, Amnon. (2011). “Optimal risk response plan of project risk management”. Paper presented at the Industrial Engineering and Engineering Management (IEEM), IEEE International Conference.
  26. Kayis, B., Arndt, G., Zhou, M., & Amornsawadwatana, S. (2007). “A risk mitigation methodology for new product and process design in concurrent engineering projects”. Annals of the CIRP, 56,167–170.
  27. Popa, Emil M, & Marcut, Ioana Gabriela. (2008). “ASM and evolutionary algorithm for economic optimization of project risk management”. Paper presented at the WSEAS International Conference, Sofia, Bulgaria.
  28. Fang, Chao, Marle, Franck, Xie, Min, & Zio, Enrico. (2013). “An integrated framework for risk response planning under resource constraints in large engineering projects”. Engineering Management, IEEE Transactions on, 60(3), 627-639.
  29. B, Dori. E,Hamze`i. (2010). “Determining the Best Responding Strategy to Project Risk Using ANP Technique (Case Study: North Azadegan Oil Field Development Project)”. Journal of Industrial Management, 2(4), 77-94 (In Persian)
  30. Al-Fawzan, Mohammad A, & Haouari, Mohamed. (2005). “A bi-objective model for robust resource-constrained project scheduling”. International Journal of production economics, 96(2), 175-187.
  31. Abbasi, Babak, Shadrokh, Shahram, & Arkat, Jamal. (2006). “Bi-objective resource-constrained project scheduling with robustness and makespan criteria”. Applied mathematics and computation, 180(1), 146-152.
  32. Chtourou, Hédi, & Haouari, Mohamed. (2008). “A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling”. Computers & Industrial Engineering, 55(1), 183-194.
  33. Hazır, Öncü, Haouari, Mohamed, & Erel, Erdal. (2010). “Robust scheduling and robustness measures for the discrete time/cost trade-off problem”. European Journal of Operational Research, 207(2), 633-643.
  34. Lambrechts, Olivier, Demeulemeester, Erik, & Herroelen, Willy. (2008). “A tabu search procedure for developing robust predictive project schedules”. International Journal of Production Economics, 111(2), 493-508.
  35. Herroelen, Willy, & Leus, Roel. (2005). “Project scheduling under uncertainty: Survey and research potentials”. European journal of operational research, 165(2), 289-306.
  36. O. Yousefi, P. Naseri, A. Nilipour Tabatabaei. (2014). “Project Risk Assessment Model Using Multi-Objective Decision-Making Approach (case study: the earth dam project Asalooye)”. Journal of Industrial Engineering, Issue 1, 125-135 (In Persian)