Abstract

This paper studies a model for integration of vehicle routing problem (VRP) in a supply chain with order assignment to the suppliers and determining their production sequence. The considered supply chain consists of some suppliers, vehicles and a manufacturer. It is assumed that manufacturer purchases identify the raw material demand of suppliers in wholesale all at once. This provides the opportunity of receiving discounts and consequently decreasing final price. A transportation fleet composed of some vehicles, each of which may have a different speed and different transport capacity, is responsible for transporting purchased raw materials to suppliers and gathering completed parts from them aiming at minimizing the total tardiness of all jobs. After presenting the mathematical model of the problem, a dynamic genetic algorithm with two dimensional structures is proposed. The algorithm was applied to the supply chain of a medical equipment manufacturer and the results were compared with real results beforehand. Findings show that applying dynamic genetic algorithm results in improving the average of tardiness from 9.44 days to 2.11 days. Also the comparison of dynamic genetic algorithm with the optimum solution for the small size problems, and the algorithm proposed for the nearest problem in the literature to our problem shows the high efficiency of dynamic genetic algorithm.

Keywords

Main Subjects


1.         Nasiri, M. and PourmohamadZia, N. (2015). “A Hybrid model for supplier selection and order allocation in supply chain”, Journal of Industrial Engineering, Vol. 49, No. 1, PP. 117–128.
2.         Omrani, H. and Adabi, F. (2016). “A multi objective planning for supply chain network design with efficient manufacturers and distributers”, Journal of Industrial Engineering, Vol. 50, No. 2, PP. 261–278.
3.         Lee, Y. H., Jeong, C. S. and Moon, C. (2002). “Advanced planning and scheduling with outsourcing in manufacturing supply chain”, Computers and Industrial Engineering, Vol. 43, No. 1–2, PP. 351–374.
4.         Berning, G., et al. (2004). “Integrating collaborative planning and supply chain optimization for the chemical process industry (I)—methodology”, Computers & Chemical Engineering, Vol. 28, No. 6–7, PP. 913–927.
5.         Naso, D. et al. (2007). “Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete”, European Journal of Operational Research, Vol. 177, No. 3, PP. 2069–2099.
6.         Averbakh, I. and Xue, Z. (2007). “On-line supply chain scheduling problems with preemption." European Journal of Operational Research, Vol. 181, No. 1, PP. 500–504.
7.         Zegordi, S. and Beheshti Nia, M. (2009). “Integrating production and transportation scheduling in a two-stage supply chain considering order assignment”, The International Journal of Advanced Manufacturing Technology, Vol. 44, No. 9–10, PP. 928–939.
8.         Sawik, T. (2009). “Coordinated supply chain scheduling." International Journal of Production Economics, Vol. 120, No. 2, PP. 437–451.
9.         Su, C.-S., Pan, J.C.-H. and Hsu, T.-S. (2009). "A new heuristic algorithm for the machine scheduling problem with job delivery coordination”, Theoretical Computer Science, Vol. 410, No. 27–29, PP. 2581–2591.
10.       Averbakh, I. (2010). “On-line integrated production–distribution scheduling problems with capacitated deliveries”, European Journal of Operational Research, Vol. 200, No. 2, PP. 377–384.
11.       Scholz-Reiter, B., Frazzon, E.M. and Makuschewitz, T. (2010). “Integrating manufacturing and logistic systems along global supply chains”, CIRP Journal of Manufacturing Science and Technology, Vol. 2, No. 3, PP. 216–223.
12.       Yimer, A.D. and Demirli, K. (2010). “A genetic approach to two-phase optimization of dynamic supply chain scheduling”, Computers and Industrial Engineering, Vol. 58, No. 3, PP. 411–422.
13.       Fahimnia, B., Luong, L.and Marian, R. (2012). “Genetic algorithm optimisation of an integrated aggregate production–distribution plan in supply chains”, International Journal of Production Research, Vol. 50, No. 1, PP. 81–96.
14.       Ullrich, C.A. (2013). “Integrated machine scheduling and vehicle routing with time windows”, European Journal of Operational Research, Vol. 227, No. 1, PP. 152–165.
15.       Selvarajah, E. and Zhang, R. (2014). “Supply chain scheduling at the manufacturer to minimize inventory holding and delivery costs”, International Journal of Production Economics, Vol. 147, Part A, No. 0, PP. 117–124.
16.       Low, C., et al. (2014). “Coordination of production scheduling and delivery problems with heterogeneous fleet”, International Journal of Production Economics, Vol. 153, No. 1, PP. 139–148.
17.       Cheng, B., Yang, Y. and Hu, X. (2015). “Supply chain scheduling with batching, production and distribution”, International Journal of Computer Integrated Manufacturing, Vol., No. ahead-of-print, PP. 1–12.
18.       Chang, Y.-C., Chang, K.-H. and Kang, T.-C. (2015). “Applied Variable Neighborhood Search-Based Approach to Solve Two-Stage Supply Chain Scheduling Problems”, Journal of Testing and Evaluation, Vol. 44, No. 3, PP. 1337-1349.
19.       Tasan, A. S. and Gen, M. (2012). “A genetic algorithm based approach to vehicle routing problem with simultaneous pick-up and deliveries”, Computers and Industrial Engineering, Vol. 62, No. 3, PP. 755–761.