A New Fuzzy Approach to Determine the Best Method for the Installation of Marine Pipelines

Document Type : Research Paper

Authors

Department of Industrial Engineering, Islamic Azad University, South Tehran Branch, Tehran, Iran

Abstract

Selecting a method for installing marine pipelines, is a major challenge for decision-makers in oil industry. In this paper, in order to choose the best method of installing marine pipelines, a new fuzzy hybrid approach is proposed. In the proposed approach, first the indices and sub-indices are determined by experts, and their weights are calculated by using fuzzy DEMATEL-ANP method. Then, by the calculated weights, and using a fuzzy multi-objective linear programming model, the best installation method is determined according to the systematic and functional constraints. To demonstrate the proposed approach efficiency, a case study has been solved by using this approach, and the result has been confirmed by the experts. The proposed approach, provides the oil industry managers with a useful tool for increasing accuracy and ease to choose the method of installation marine pipelines.

Keywords

Main Subjects


Halman, J. and Braks, B. (1998). “Project alliancing in the offshore industry”, International Journal of Project Management, Vol. 92, No. 1, PP. 14-32.
2. Dey, P. K. (2002). “An integrated assessment model for cross-country pipelines”, Environmental Impact Assessment Review, Vol. 22, No. 6, PP. 703-721.
3. Chen, S. and Fu, G. (2002). “A fuzzy approach to the prototype optimization of offshores platforms”, Ocean Engineering, Vol. 88, No. 2, PP. 877-891.
4. Khan, F. I., Sadiq, R. and Husain, T. (2002). “Risk-based process safety assessment and control measures design for offshore process facilities”, Journal of Hazardous Materials, Vol. 94, No. 1, PP. 1-36.
5. Dey, P. K. (2006). “Integrated project evaluation and selection using multiple-attribute decision-making technique”, International Journal of Production Economics, Vol. 103, No. 1, PP. 90-103.
6. Kaiser, M. J. (2009). “Modeling the time and cost to drill an offshore well”, Renewable Energy, Vol. 34, No. 9, PP. 1097-1112.
7. Tavana, M., Behzadian, M. and Pirdashti, M. (2012). “A PROMETHEE-GDSS for oil and gas pipeline planning in the Caspian Sea basin”, Energy Economics, Vol. 22, No. 4, PP. 128-137.
8. Tavana, M., Pirdashti, M., Kennedy, Dennis.T, Belaud, J-P. and Behzadian, M. (2012). “A hybrid Delphi-SWOT paradigm for oil and gas pipeline strategic planning in Caspian Sea basin”, Energy Policy, No. 40, PP. 345-360.
9. Kaiser, M. J. and Snyder, B. F. (2013). “Modeling offshore wind installation costs on the US Outer Continental Shelf”, Renewable Energy, Vol. 50, No. 2, PP. 676-691.
10. Madeley, Ch. (2013). “Optimization of Subsea Tie-In spools using evolutionary algorithms.” ASME 2013, 32nd International Conference on Ocean, Offshore and Arctic Engineering, Vol. 4B: Pipeline and Riser Technology.
11. Gabus A. and Fontela, E. (1972). World problems: An invitation to further thought within the framework of DEMATEL, Report No.1. Switzerland.
12. Tzeng, G., Chiang, C. and Li, C. (2007). “Evaluating intertwined effects in e-learning programs: A novel hybrid MCDM model based on factor analysis and DEMATEL”, Expert Systems with Applications, No. 32, PP. 1028-1044.
13. Wu, W. (2008). “Choosing knowledge management strategies by using a combined ANP and DEMATEL approach”, Expert Systems with Applications, No. 35, PP. 828-835.
14. Lin C. and Wu, W. (2008). “A causal analytical method for group decision-making under fuzzy environment”, Expert Systems with Applications, No. 34, PP. 205-213.
15. Saaty, T. (1996). Decision making with dependence and feedback: The analytic network process: the organization and prioritization of complexity, RWS Publications, Pittsburgh PA.
16. Saaty, L. (1980). The analytical hierarchy process, McGraw-Hill, New York.
17. Yang, L., Chiu, N. and Tzeng, G. (2008). “Vendor selection by integrated fuzzy MCDM techniques with independence and interdependence”, Information Sciences, Vol. 178, No. 21, PP. 4166–4183.
18. Weber, C. A. and Current, J. R. (1993). “A multi-objective approach to vendor selection”, European Journal of Operations Research, No. 68, PP. 173–184.
19. Lin, Ch., Wu, T-F. and Weng, R. (2004). “Probability Estimates for Multi-class Classification by Pairwise Coupling”, Journal of Machine Learning Research, No. 5, PP. 975-1005.
20. Leung, L. C. and Cao, D. (2000). “On consistency and ranking of alternatives in fuzzy AHP”, European Journal of Operational Research, No. 124, PP. 102–113.
21. Opricovic, S. and Tzeng, G. (2003). “Defuzzification within a multi criteria decision model”, International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems, No. 11, PP. 635-652