Main Subjects = Operation and Production Engineering
Availability analysis for general repairable series and parallel systems with repair time threshold

Articles in Press, Accepted Manuscript, Available Online from 26 August 2024

10.22059/aie.2024.374009.1892

Mohammad Sheikhalishahi; Mohammadreza Eslamipirharati; Mehr Sadat Salami; Hosein Jorat


Performance Oriented Scheduling and Allocation Technique in Edge-Fog-Cloud Collaborative Environment

Articles in Press, Accepted Manuscript, Available Online from 01 September 2024

10.22059/aie.2024.379026.1899

fatemeh ghayoor; Donya Rahmani; Amir Hossein Jafari Pozveh


Flexible Flowshop Scheduling Problem Considering Manpower Skill-based Processing Times

Volume 58, Issue 1, June 2024, Pages 13-36

10.22059/aie.2024.345213.1844

Seyed Mohammad Hassan Hosseini; hossein Amoozad khalili; moujan shirali


A Robust Optimization Model for Aggregate Production Planning with Postponement Policy

Volume 51, Issue 4, January 2018, Pages 389-404

10.22059/jieng.2017.214625.1201

Adel Aazami; Armin Jabbarzadeh; Ahmad Makui


A Hierarchical Approach for Lot-sizing and Production Scheduling of Complementary Product Packages

Volume 51, Issue 2, July 2017, Pages 207-222

10.22059/jieng.2017.62213

Najmeh Abbasi Hafshejani; Mohammad Mahdi Lotfi; Mahboobe Honarvar


Developing an Integrated Approach for Inventory Control, Pricing and Advertisement of Deteriorating Items

Volume 50, Issue 3, December 2016, Pages 407-4016

10.22059/jieng.2016.63160

Masoud Rabbani; Nadia Pourmohammad-Zia; Hamed Rafiei


A Bi-objective Mathematical Model Toward Staff Planning Considering Cross-training

Volume 50, Issue 2, October 2016, Pages 221-233

10.22059/jieng.2016.60726

Hamed Habibnejad; masoud Rabbani; Babak Javadi; Nastaran Ghorbani-Kutenaie


Simoltaneous Lot-sizing and Scheduling in Hybrid Flow Shop Production Environment with Resource Constraint

Volume 50, Issue 2, October 2016, Pages 295-310

10.22059/jieng.2016.60731

Sahar Fallah Sanami; Reza Ramezanian; Mohsen Shafiei Nikabadi