Abbasiparizi, Saeid A Bender’s Decomposition Algorithm for Multi-objective Hub Location Problem Considering Stochastic Characteristics [Volume 48, Issue 2, 2014, Pages 243-255]
Abdollahzade, Majid Analyzing the Relationship between Contractor’s Qualification Measures and Project Quality in Research Projects: a Case Study [Volume 48, Issue 2, 2014, Pages 151-166]
Abooie, M. H. A Simulation-optimization Approach for Replenishment Planning and Shelf Space Allocation in Retail Industry under Zone- and Stock-dependent Demand [Volume 48, Special Issue, 2014, Pages 55-62]
Aghdasi, M. Application of Value Stream Mapping for Waste Reduction in Make-to-order Environment (An Action Research in a Commercial Printing Company) [Volume 48, Special Issue, 2014, Pages 111-121]
Aghdasi, Mohammad Robust Economic-Statistical Design of Control Charts - A Case Study in Automotive Industry [Volume 48, Issue 2, 2014, Pages 229-241]
Akbaripour, H. A Hybrid Artificial Neural Network for Selecting Product Investment Solution [Volume 48, Issue 1, 2014, Pages 51-65]
Akbaripour, Hossein Designing an Expert System for Management of Crowding and Overcrowding in Emergency Departments [Volume 48, Issue 2, 2014, Pages 281-292]
Akbary, A. A Novel Hybrid Model for Loan Allocation in Banking Investment Projects (Case Study: Bank Toseeye Taavon) [Volume 48, Issue 1, 2014, Pages 95-108]
Amin Naseri, MohammadReza Designing an Expert System for Management of Crowding and Overcrowding in Emergency Departments [Volume 48, Issue 2, 2014, Pages 281-292]
Amin-Naseri, M.R. A Hybrid Artificial Neural Network for Selecting Product Investment Solution [Volume 48, Issue 1, 2014, Pages 51-65]
Aminnayeri, M. Change Point Estimation in the Mean of Polynomial Profiles under Drift [Volume 48, Special Issue, 2014, Pages 63-70]
Aminnayeri, Majid A Bender’s Decomposition Algorithm for Multi-objective Hub Location Problem Considering Stochastic Characteristics [Volume 48, Issue 2, 2014, Pages 243-255]
Arkat, J. Network Location Problem for Two Congestible Facilities Considering Impatient Customers [Volume 48, Issue 1, 2014, Pages 13-22]
Asadpoor, A. A Decision Making Model to Select Business Intelligence Systems by Using Grey Theory (Technical note) [Volume 48, Issue 1, 2014, Pages 73-82]
Asgarinezhad, Abbas Performance Evaluation of Mazandaran Water and Wastewater by Data Envelopment Analysis and Artificial Neural Network [Volume 48, Issue 2, 2014, Pages 201-213]
Ayoubi, M. Change Point Estimation in the Mean of Polynomial Profiles under Drift [Volume 48, Special Issue, 2014, Pages 63-70]
Azadeh, A. Implementation of Particle Swarm Algorithm in Optimization Approach Using Simulation [Volume 48, Issue 1, 2014, Pages 1-11]
B
Babaei, M. S. Pricing and Inventory Decisions of Deteriorating Complementary Products [Volume 48, Issue 1, 2014, Pages 83-94]
Baradaran Kazemzadeh, Reza Robust Economic-Statistical Design of Control Charts - A Case Study in Automotive Industry [Volume 48, Issue 2, 2014, Pages 229-241]
Barzinpour, F. Forecasting Effects of Scenarios of Subsides Removal on Residential Electricity Consumption by Artificial Neural Networks [Volume 48, Special Issue, 2014, Pages 83-90]
Bashiri, Mahdi A Bender’s Decomposition Algorithm for Multi-objective Hub Location Problem Considering Stochastic Characteristics [Volume 48, Issue 2, 2014, Pages 243-255]
Behdad, Kian Designing a Residential Valuation Model through Analytic Hierarchy Process [Volume 48, Issue 2, 2014, Pages 167-176]
Bozorgi-Amiri, A. A Hub Location Model with Hierarchical Allocation and Limited Demand for Post Network [Volume 48, Issue 1, 2014, Pages 37-50]
Bozorgi-Amiri, A. A location Model for Blood Donation Camps with Consideration of Disruption [Volume 48, Special Issue, 2014, Pages 33-43]
E
Eshgarf, Reza Identification of Factors Affecting the Privatization of Iran's Gas Refining Industry; an Integrated Approach Delphi- DEMATEL: Parsian Gas Refinery Co. [Volume 48, Issue 2, 2014, Pages 137-150]
Eslami, A.A. A Scenario-Based Model for Redundancy Allocation with Choice of Redundancy Strategies [Volume 48, Special Issue, 2014, Pages 91-98]
Evaz Abadian, Farshid A Bi-objective Model for a Flowshop Scheduling Problem with Availability Constraint of Machines [Volume 48, Issue 2, 2014, Pages 189-200]
F
Fallah Nezhad, M. S. A Simulation-optimization Approach for Replenishment Planning and Shelf Space Allocation in Retail Industry under Zone- and Stock-dependent Demand [Volume 48, Special Issue, 2014, Pages 55-62]
Fallah Sanami, Sahar Particle Swarm Optimization Algorithm for Integrated Lot-sizing and Scheduling in Flowshop Production Environment [Volume 48, Issue 2, 2014, Pages 215-228]
Farsi, M.A. A Scenario-Based Model for Redundancy Allocation with Choice of Redundancy Strategies [Volume 48, Special Issue, 2014, Pages 91-98]
Farzaneh, Mandana Designing a Residential Valuation Model through Analytic Hierarchy Process [Volume 48, Issue 2, 2014, Pages 167-176]
Feizi, K. A Decision Making Model to Select Business Intelligence Systems by Using Grey Theory (Technical note) [Volume 48, Issue 1, 2014, Pages 73-82]
G
Ghandehari, M. Optimal Location of Passive Defense Facilities through Game Theory [Volume 48, Special Issue, 2014, Pages 19-32]
Ghazavi, E. A Simulation-optimization Approach for Replenishment Planning and Shelf Space Allocation in Retail Industry under Zone- and Stock-dependent Demand [Volume 48, Special Issue, 2014, Pages 55-62]
Ghorbani, B. Capacitated Multi-depot Vehicle Routing Problem with Inter-depot Routes [Volume 48, Special Issue, 2014, Pages 11-18]
H
Hashemi, Sara Designing an Expert System for Management of Crowding and Overcrowding in Emergency Departments [Volume 48, Issue 2, 2014, Pages 281-292]
Hashemifar, M. Measuring Supply Chain Flexibility using Fuzzy AHP and Fuzzy TOPSIS (Case study: Clothing Industry) [Volume 48, Special Issue, 2014, Pages 1-10]
Hassani Doughabadi, M. A Multi-objective Model to Optimize Gate and Counters Assignment to Arrival Flights
(Case study: Imam Khomeini Airport) (Technical note) [Volume 48, Issue 1, 2014, Pages 67-72]
Hosseini, M. A New Approach to Customer Segmentation in the Fixed-line Telecom Using RFM Model [Volume 48, Issue 1, 2014, Pages 23-36]
I
Iranmanesh, Seyed Hossein Analyzing the Relationship between Contractor’s Qualification Measures and Project Quality in Research Projects: a Case Study [Volume 48, Issue 2, 2014, Pages 151-166]
Isaai, Mohammad taghi Designing a Residential Valuation Model through Analytic Hierarchy Process [Volume 48, Issue 2, 2014, Pages 167-176]
Isvand, F. A New Approach to Customer Segmentation in the Fixed-line Telecom Using RFM Model [Volume 48, Issue 1, 2014, Pages 23-36]
J
Jalili Bolhassani, S. Capacitated Multi-depot Vehicle Routing Problem with Inter-depot Routes [Volume 48, Special Issue, 2014, Pages 11-18]
Jamali Firoozabadi, K. A Multi-objective Model to Optimize Gate and Counters Assignment to Arrival Flights
(Case study: Imam Khomeini Airport) (Technical note) [Volume 48, Issue 1, 2014, Pages 67-72]
K
Karimi, H. Capacitated Multi-depot Vehicle Routing Problem with Inter-depot Routes [Volume 48, Special Issue, 2014, Pages 11-18]
Karimi, S. Forecasting Effects of Scenarios of Subsides Removal on Residential Electricity Consumption by Artificial Neural Networks [Volume 48, Special Issue, 2014, Pages 83-90]
Keramati, Abbas Developing a Product Recommender System: Designing a Hybrid Model Using Data Mining Techniques [Volume 48, Issue 2, 2014, Pages 257-280]
Khaleghi, Roshanak Developing a Product Recommender System: Designing a Hybrid Model Using Data Mining Techniques [Volume 48, Issue 2, 2014, Pages 257-280]
L
Lotfi, M. An Expert System for Identification of Forecasting Model for Time Series [Volume 48, Special Issue, 2014, Pages 71-82]
Lotfi, M. M. A Simulation-optimization Approach for Replenishment Planning and Shelf Space Allocation in Retail Industry under Zone- and Stock-dependent Demand [Volume 48, Special Issue, 2014, Pages 55-62]
M
Maboudian, Y. Business Continuity Management in Iran- A Survey Research [Volume 48, Special Issue, 2014, Pages 99-110]
Mehmanchi, E. A Model to Solve Project Scheduling and Staff Assignment Problems [Volume 48, Special Issue, 2014, Pages 45-54]
Mina, Hassan Developing a New Approach for Product Performance Evaluation Based on Balanced Scorecard:
An empirical study of a Dairy Company [Volume 48, Issue 2, 2014, Pages 177-188]
Mirzamohammadi, Saeed Identification of Factors Affecting the Privatization of Iran's Gas Refining Industry; an Integrated Approach Delphi- DEMATEL: Parsian Gas Refinery Co. [Volume 48, Issue 2, 2014, Pages 137-150]
Mohammadi, B. Change Point Estimation in the Mean of Polynomial Profiles under Drift [Volume 48, Special Issue, 2014, Pages 63-70]
Monshi, F. Joint Scheduling and Available-to-Promise calculation in Make-to-Forecast Production Systems [Volume 48, Special Issue, 2014, Pages 123-129]
Mousavizadeh, R. Optimal Location of Passive Defense Facilities through Game Theory [Volume 48, Special Issue, 2014, Pages 19-32]
N
Naseri, P. Project Risk Assessment Model Using Multi-Objective Decision-Making Approach (case study: the earth dam project Asalooye) [Volume 48, Issue 1, 2014, Pages 125-135]
Nasrollahi, Meisam Developing a New Approach for Product Performance Evaluation Based on Balanced Scorecard:
An empirical study of a Dairy Company [Volume 48, Issue 2, 2014, Pages 177-188]
Nikbakhsh, E. A Memetic Algorithm for Designing a Capacitated Hub Network under Demand Uncertainty and Disruption [Volume 48, Issue 1, 2014, Pages 109-123]
Nilipour Tabatabaei, A. Project Risk Assessment Model Using Multi-Objective Decision-Making Approach (case study: the earth dam project Asalooye) [Volume 48, Issue 1, 2014, Pages 125-135]
Nojavan, M. A Novel Hybrid Model for Loan Allocation in Banking Investment Projects (Case Study: Bank Toseeye Taavon) [Volume 48, Issue 1, 2014, Pages 95-108]
Nojavan, M. Measuring Supply Chain Flexibility using Fuzzy AHP and Fuzzy TOPSIS (Case study: Clothing Industry) [Volume 48, Special Issue, 2014, Pages 1-10]
O
Omrani, H. A location Model for Blood Donation Camps with Consideration of Disruption [Volume 48, Special Issue, 2014, Pages 33-43]
P
Pashapour, Sh. Implementation of Particle Swarm Algorithm in Optimization Approach Using Simulation [Volume 48, Issue 1, 2014, Pages 1-11]
Pourreza, S. A Hybrid Artificial Neural Network for Selecting Product Investment Solution [Volume 48, Issue 1, 2014, Pages 51-65]
R
Rabani, M. Joint Scheduling and Available-to-Promise calculation in Make-to-Forecast Production Systems [Volume 48, Special Issue, 2014, Pages 123-129]
Rafiei, H. Joint Scheduling and Available-to-Promise calculation in Make-to-Forecast Production Systems [Volume 48, Special Issue, 2014, Pages 123-129]
Ramezanian, Reza Particle Swarm Optimization Algorithm for Integrated Lot-sizing and Scheduling in Flowshop Production Environment [Volume 48, Issue 2, 2014, Pages 215-228]
Rashidi Komijan, A. A Multi-objective Model to Optimize Gate and Counters Assignment to Arrival Flights
(Case study: Imam Khomeini Airport) (Technical note) [Volume 48, Issue 1, 2014, Pages 67-72]
Razavi, H. An Expert System for Identification of Forecasting Model for Time Series [Volume 48, Special Issue, 2014, Pages 71-82]
Razmi, Jafar Developing a New Approach for Product Performance Evaluation Based on Balanced Scorecard:
An empirical study of a Dairy Company [Volume 48, Issue 2, 2014, Pages 177-188]
Rezaeian, Javad Performance Evaluation of Mazandaran Water and Wastewater by Data Envelopment Analysis and Artificial Neural Network [Volume 48, Issue 2, 2014, Pages 201-213]
Rezaei Malek, Mohammad A Bi-objective Model for a Flowshop Scheduling Problem with Availability Constraint of Machines [Volume 48, Issue 2, 2014, Pages 189-200]
Rezaie, K. Business Continuity Management in Iran- A Survey Research [Volume 48, Special Issue, 2014, Pages 99-110]
Ronaghi, M.H. A Decision Making Model to Select Business Intelligence Systems by Using Grey Theory (Technical note) [Volume 48, Issue 1, 2014, Pages 73-82]
S
Sadeghi, Kh. Application of Value Stream Mapping for Waste Reduction in Make-to-order Environment (An Action Research in a Commercial Printing Company) [Volume 48, Special Issue, 2014, Pages 111-121]
Safaei, Abdolsattar Robust Economic-Statistical Design of Control Charts - A Case Study in Automotive Industry [Volume 48, Issue 2, 2014, Pages 229-241]
Sajadi, Seyed Jafar Identification of Factors Affecting the Privatization of Iran's Gas Refining Industry; an Integrated Approach Delphi- DEMATEL: Parsian Gas Refinery Co. [Volume 48, Issue 2, 2014, Pages 137-150]
Sarajian, A. A Hub Location Model with Hierarchical Allocation and Limited Demand for Post Network [Volume 48, Issue 1, 2014, Pages 37-50]
Setak, M. Capacitated Multi-depot Vehicle Routing Problem with Inter-depot Routes [Volume 48, Special Issue, 2014, Pages 11-18]
Seyed-esfahani, M. A Scenario-Based Model for Redundancy Allocation with Choice of Redundancy Strategies [Volume 48, Special Issue, 2014, Pages 91-98]
Shadrokh, Sh. A Model to Solve Project Scheduling and Staff Assignment Problems [Volume 48, Special Issue, 2014, Pages 45-54]
Shafiei Nikabadi, Mohsen Particle Swarm Optimization Algorithm for Integrated Lot-sizing and Scheduling in Flowshop Production Environment [Volume 48, Issue 2, 2014, Pages 215-228]
Shakhsi Niaei, Majid Analyzing the Relationship between Contractor’s Qualification Measures and Project Quality in Research Projects: a Case Study [Volume 48, Issue 2, 2014, Pages 151-166]
Shiri, H. Implementation of Particle Swarm Algorithm in Optimization Approach Using Simulation [Volume 48, Issue 1, 2014, Pages 1-11]
Shokri, Ali Designing an Expert System for Management of Crowding and Overcrowding in Emergency Departments [Volume 48, Issue 2, 2014, Pages 281-292]
Sobhani, Fateme Analyzing the Relationship between Contractor’s Qualification Measures and Project Quality in Research Projects: a Case Study [Volume 48, Issue 2, 2014, Pages 151-166]
T
Taleizadeh, A. Pricing and Inventory Decisions of Deteriorating Complementary Products [Volume 48, Issue 1, 2014, Pages 83-94]
Tavakkoli Moghaddam, Reza A Bi-objective Model for a Flowshop Scheduling Problem with Availability Constraint of Machines [Volume 48, Issue 2, 2014, Pages 189-200]
Teimury, E. Measuring Supply Chain Flexibility using Fuzzy AHP and Fuzzy TOPSIS (Case study: Clothing Industry) [Volume 48, Special Issue, 2014, Pages 1-10]
Torkestani, S. A Hub Location Model with Hierarchical Allocation and Limited Demand for Post Network [Volume 48, Issue 1, 2014, Pages 37-50]
Y
Yousefi, O. Project Risk Assessment Model Using Multi-Objective Decision-Making Approach (case study: the earth dam project Asalooye) [Volume 48, Issue 1, 2014, Pages 125-135]
Z
Zamani, Sh. Network Location Problem for Two Congestible Facilities Considering Impatient Customers [Volume 48, Issue 1, 2014, Pages 13-22]
Zegordi, S. H. A Memetic Algorithm for Designing a Capacitated Hub Network under Demand Uncertainty and Disruption [Volume 48, Issue 1, 2014, Pages 109-123]
Zendehdel, M. A location Model for Blood Donation Camps with Consideration of Disruption [Volume 48, Special Issue, 2014, Pages 33-43]